Project · Industrial · Cuernavaca, Morelos

Bridgestone — Industrial building for the mixing process

A five-level industrial building — three of them basements — for the mixing area of Bridgestone's plant in Cuernavaca. The project required geotechnical studies, diaphragm walls and an overhead traveling crane to move molds and raw materials.

Client: Bridgestone Industry: Industrial Location: Cuernavaca, Morelos Area: +2,000 m²

Scope of work

  • Five-level building: three basements and two upper levels
  • Deep foundations and diaphragm walls
  • Overhead traveling crane
  • Specialized extraction and ventilation systems
  • Equipment protection: fire detection and suppression, humidity and temperature control
  • Coordination through a BIM model

Related article: Special Industrial Project: Underground Engineering for a Tire Plant

Region: Central Mexico  ·  See more projects in Morelos →

Project gallery

Bridgestone

Bridgestone — Industrial building for the mixing process (Cuernavaca, Morelos) 1 Bridgestone — Industrial building for the mixing process (Cuernavaca, Morelos) 2 Bridgestone — Industrial building for the mixing process (Cuernavaca, Morelos) 3 Bridgestone — Industrial building for the mixing process (Cuernavaca, Morelos) 4 Bridgestone — Industrial building for the mixing process (Cuernavaca, Morelos) 5
CAABSA STEEL

Have a project like this?

45 years building facilities, plants and corporate spaces for AAA and AA companies, under ISO 9001:2015 certified processes.

Get a quote
Request a quote

Do you have an industrial project coming up?

We advise you at no cost and with no commitment. Tell us what you need and we'll get back to you within 24 hours.

  • A reply from an engineer within 24 hours
  • Site visit and preliminary design at no cost
  • ISO 9001:2015 certified processes
Message us on WhatsApp

Shall we quote your project?